The Shaoxing Metro Line 1 Jianhu parking lot site spans 17.1 hectares, with the cover plate of the subway lot covering a 227,000-square-meter building area. The space, multiple disciplines, materials, and machinery presented coordination and management challenges, compounded by a tight schedule. To overcome these difficulties, implement safe construction, and meet environmental protection requirements, the construction team needed to establish a digitally connected data environment.
They selected ProjectWise to integrate design, construction, and collaboration among the multiple disciplines and implement digital data processes, improving control over project costs and schedule. Using ContextCapture for reality modeling and earthworks calculations optimized site planning and mountain protection, providing accurate topographic data and images. OpenBuildings Designer enabled architectural modeling for the electromechanical installation, reducing suspension and support costs by 5% and the construction period by 15 days. The digital twin will be continually updated for future operations and maintenance use. Project